E_BA_StateSeqLink

This enum indicates the status of FB_BA_SequenceLinkBase and FB_BA_PIDControlSequenceLink.

Syntax

{attribute 'qualified_only'}
{attribute strict}
TYPE E_BA_NoStartCtrlFound :
(
     eOff                                            := 1,
     eOn                                             := 2,
     eMultipleDirectionActionSeqCtrl                 := 3,
     eNextSequenceSetpointIsSmaller                  := 4,
     eStartSequenceControllerNotEnabled              := 5,
     eSeqNumMultiple                                 := 6,
     eErrorParamMaxSeqCtrl                           := 7,
     eNoSequenceControllerIsOperational              := 8,
     eSynchronisationSequenceControllerNotEnabled    := 9
) UDINT;
END_TYPE

Name

Description

eOff

The function block is not enabled via bEn.

eOn

The sequence is running.

eMultipleDirectionActionSeqCtrl

Multiple control directions of the sequence controllers. The sequence controllers are always checked in ascending numerical order, starting with the lowest-numbered controller. Changing the direction of action would be fine. In energy recovery, the control direction changes based on a comparison of the outside temperature and the exhaust air temperature. The example below shows the multiple control directions in field 5 of the array.

eNextSequenceSetpointIsSmaller

The next sequence setpoint is less than the previous one. stSeqLink.arrSeqLinkData[1].fW >= stSeqLink.arrSeqLinkData[2].fW >= stSeqLink.arrSeqLinkData[3].fW … stSeqLink.arrSeqLinkData[BA_Param.nMaxSeqCtrl].fW

eStartSequenceControllerNotEnabled

The start controller nNumStartCtrl has not been enabled. The next steps for finding a start controller are defined using the E_BA_NoStartCtrlFound enumeration. This ensures that the sequence always starts up.

eSeqNumMultiple

A sequence number stSeqLink.arrSeqLinkData[x].nMyNum has been assigned more than once. This event is indicated by a TRUE value in stSeqLink.arrSeqLinkData[x].bSeqNumMultiple.

eErrorParamMaxSeqCtrl

The global parameter BA_Param.nMaxSeqCtrl has a value of 0. This is the only event that stops sequence control.

eNoSequenceControllerIsOperational

No sequence controller is operational. stSeqLink.arrSeqLinkData[x].bSeqCtrlOperable.

eSynchronisationSequenceControllerNotEnabled

The synchronization sequence controller is not enabled.

Example for eMultipleDirectionActionSeqCtrl:

stSeqLink.arrSeqLinkData[1].eActn = E_BA_Action.eReverse stSeqLink.arrSeqLinkData[2].eActn = E_BA_Action.eReverse stSeqLink.arrSeqLinkData[3].eActn = E_BA_Action.eReverse stSeqLink.arrSeqLinkData[4].eActn = E_BA_Action.eDirect stSeqLink.arrSeqLinkData[5].eActn = E_BA_Action.eReverse stSeqLink.arrSeqLinkData[6].eActn = E_BA_Action.eDirect stSeqLink.arrSeqLinkData[7].eActn = E_BA_Action.eDirect stSeqLink.arrSeqLinkData[8].eActn = E_BA_Action.eDirect