Installing the guide rails on the motor modules
Notice | ||
Restoring the safe, de-energized state After a successful system test, be sure to place the system in a safe, de-energized state before installing the guide rails.
| ||
![]() | Lock for mover installation A 250 mm-long guide rail serves as a lock for installing the movers on the guide rails. The lock must be removed before installing the movers and replaced with the rail mounting aid [+]. Further information can be found in the chapter Installing the movers. |
