Interoperability list according to IEC 60870-5-103 (master)

für TwinCAT SPS Bibliothek: IEC 60870-5-103 Zentralstation (master).

Interoperability list according to IEC 60870-5-103 (master) 1:

Version: 1.2
Datum: 07.03.2014

Here you can open/save the compatibility list (zipped PDF): kompatib103master.zip

Table of contents:

Electrical interface

Optical interface

Transfer velocity

Transfer modus for application data

Common address of ASDU

Selection of standardised ASDUs in monitoring direction

Selection of standardised ASDUs in control direction

Selection of standardised information numbers in monitoring direction

Selection of standardised information numbers in control direction

Basic application functions

Miscellaneous

General Information

 

This compatibility list refers to functions supported within IEC 870-5-103.

Compatibility of the individual components has to be agreed for individual projects by all parties involved.

Project information

Projekt No.: ______________________________________________________________________________

Project: ______________________________________________________________________________

Responsible: ______________________________________________________________________________

Date: ______________________________________________________________________________

Compatibility

The selected parameters should be marked in the white control fields as follows:

Interoperability list according to IEC 60870-5-103 (master) 2:

Function or ASDU is not used

Interoperability list according to IEC 60870-5-103 (master) 3:

Function or ASDU is used as specified (preferred option)

System or device

Interoperability list according to IEC 60870-5-103 (master) 4:

System definition

Interoperability list according to IEC 60870-5-103 (master) 5:

Specifications for the control station

Interoperability list according to IEC 60870-5-103 (master) 6:

Specifications for the controlled station

Physical layer

Interoperability list according to IEC 60870-5-103 (master) 7:

EIA RS-485

Interoperability list according to IEC 60870-5-103 (master) 8:

Count of load

..................

for one protection direction

Interoperability list according to IEC 60870-5-103 (master) 9:

EIA RS-485 defines the unit loads in that way, that 32 of them can be operated at one line.

Single information, see EIA RS 485, article 3

Interoperability list according to IEC 60870-5-103 (master) 10:

Fibre optics

Interoperability list according to IEC 60870-5-103 (master) 11:

plactic fibre

Interoperability list according to IEC 60870-5-103 (master) 12:

F-SMA plug

Interoperability list according to IEC 60870-5-103 (master) 13:

BFOC/2,5 plug

Interoperability list according to IEC 60870-5-103 (master) 14:

9600 bit/s

Interoperability list according to IEC 60870-5-103 (master) 15:

19200 bit/s

Link layer

No options for the link layer.

Application layer

Transfer mode for application data

According to this application-related standard, only mode 1 (octet with the lowest value first) according to 4.10 IEC 60870-5-4 is used.

Interoperability list according to IEC 60870-5-103 (master) 16:

One COMMON ADDRESS of ASDU

Interoperability list according to IEC 60870-5-103 (master) 17:

Identical with station address

Interoperability list according to IEC 60870-5-103 (master) 18:

Not identical with station address

Interoperability list according to IEC 60870-5-103 (master) 19:

More than one COMMON ADDRESS of ASDU

 

 

 

 

 

<0> := not used

-

Interoperability list according to IEC 60870-5-103 (master) 20:

<1> :=Time-tagged message

M_TTM_TA_3

Interoperability list according to IEC 60870-5-103 (master) 21:

<2> := Time-tagged message with relative time

M_TMR_TA_3

Interoperability list according to IEC 60870-5-103 (master) 22:

<3> := Measurands I

M_MEI_NA_3

Interoperability list according to IEC 60870-5-103 (master) 23:

<4> := Time-tagged measurands with relative time

M_TME_TA_3

Interoperability list according to IEC 60870-5-103 (master) 24:

<5> := Identification

M_IRC_NA_3

Interoperability list according to IEC 60870-5-103 (master) 25:

<6> := Time synchronisation

M_SYN_TA_3

Interoperability list according to IEC 60870-5-103 (master) 26:

<8> := Termination of general interrogation

M_TGI_NA_3

Interoperability list according to IEC 60870-5-103 (master) 27:

<9> := Measurands II

M_MEII_NA_3

Interoperability list according to IEC 60870-5-103 (master) 28:

<10> := Generic data

M_GD_XA_3

Interoperability list according to IEC 60870-5-103 (master) 29:

<11> := Generic identification

M_GI_XA_3

Interoperability list according to IEC 60870-5-103 (master) 30:

<23> := List of recorded disturbances

M_LRD_TA_3

Interoperability list according to IEC 60870-5-103 (master) 31:

<26> := Ready for transmission of disturbance data

M_RTD_TA_3

Interoperability list according to IEC 60870-5-103 (master) 32:

<27> := Ready for transmission of channel

M_RTC_NA_3

Interoperability list according to IEC 60870-5-103 (master) 33:

<28> := Ready for transmission of tags

M_RTT_NA_3

Interoperability list according to IEC 60870-5-103 (master) 34:

<29> := Transmission of tags

M_TOT_NA_3

Interoperability list according to IEC 60870-5-103 (master) 35:

<30> := Transmission of disturbance values

M_TOV_NA_3

Interoperability list according to IEC 60870-5-103 (master) 36:

<31> := End of transmission

M_EOT_NA_3

 

<0> := not used

-

Interoperability list according to IEC 60870-5-103 (master) 37:

<6> := Time synchronisation

C_SYN_TA_3

Interoperability list according to IEC 60870-5-103 (master) 38:

<7> := General interrogation

C_IGI_NA_3

Interoperability list according to IEC 60870-5-103 (master) 39:

<10> := Generic data

C_GD_NA_3

Interoperability list according to IEC 60870-5-103 (master) 40:

<20> := General command

C_GRC_NA_3

Interoperability list according to IEC 60870-5-103 (master) 41:

<21> := Generic command

C_GC_NA_3

Interoperability list according to IEC 60870-5-103 (master) 42:

<24> := Order for disturbance data transmission

C_ODT_NA_3

Interoperability list according to IEC 60870-5-103 (master) 43:

<25> := Acknowledgement for disturbance data transmission

C_ADT_NA_3

Selection of standardised ASDUs in monitoring direction

System functions in monitoring direction

 

INF

Description

Interoperability list according to IEC 60870-5-103 (master) 44:

<0>

End of general interrogation

Interoperability list according to IEC 60870-5-103 (master) 45:

<1>

Time synchronisation

Interoperability list according to IEC 60870-5-103 (master) 46:

<2>

Reset FCB

Interoperability list according to IEC 60870-5-103 (master) 47:

<3>

Reset KE

Interoperability list according to IEC 60870-5-103 (master) 48:

<4>

Start / Restart

Interoperability list according to IEC 60870-5-103 (master) 49:

<5>

First start

Items describing the status in monitoring direction

 

INF

Description

Interoperability list according to IEC 60870-5-103 (master) 50:

<16>

Automatic restart active

Interoperability list according to IEC 60870-5-103 (master) 51:

<17>

Protection signal transfer active

Interoperability list according to IEC 60870-5-103 (master) 52:

<18>

Protection active

Interoperability list according to IEC 60870-5-103 (master) 53:

<19>

Reset display

Interoperability list according to IEC 60870-5-103 (master) 54:

<20>

Latch of monitoring direction

Interoperability list according to IEC 60870-5-103 (master) 55:

<21>

Test operation

Interoperability list according to IEC 60870-5-103 (master) 56:

<22>

Parametrisation on site

Interoperability list according to IEC 60870-5-103 (master) 57:

<23>

Characteristic curve 1

Interoperability list according to IEC 60870-5-103 (master) 58:

<24>

Characteristic curve 2

Interoperability list according to IEC 60870-5-103 (master) 59:

<25>

Characteristic curve 3

Interoperability list according to IEC 60870-5-103 (master) 60:

<26>

Characteristic curve 4

Interoperability list according to IEC 60870-5-103 (master) 61:

<27>

Input 1

Interoperability list according to IEC 60870-5-103 (master) 62:

<28>

Input 2

Interoperability list according to IEC 60870-5-103 (master) 63:

<29>

Input 3

Interoperability list according to IEC 60870-5-103 (master) 64:

<30>

Input 4

Monitoring messages in monitoring direction

 

INF

Description

Interoperability list according to IEC 60870-5-103 (master) 65:

<32>

Measurement monitoring I

Interoperability list according to IEC 60870-5-103 (master) 66:

<33>

Measurement monitoring V

Interoperability list according to IEC 60870-5-103 (master) 67:

<35>

Rotating field monitoring

Interoperability list according to IEC 60870-5-103 (master) 68:

<36>

Trigger cycle monitoring

Interoperability list according to IEC 60870-5-103 (master) 69:

<37>

UMZ emergency operation

Interoperability list according to IEC 60870-5-103 (master) 70:

<38>

VT automatic case

Interoperability list according to IEC 60870-5-103 (master) 71:

<39>

Protection signal transfer defective

Interoperability list according to IEC 60870-5-103 (master) 72:

<46>

collective message caution

Interoperability list according to IEC 60870-5-103 (master) 73:

<47>

collective message error

Earth leakage messages in monitoring direction

 

INF

Description

Interoperability list according to IEC 60870-5-103 (master) 74:

<48>

Earth leakage L1

Interoperability list according to IEC 60870-5-103 (master) 75:

<49>

Earth leakage L2

Interoperability list according to IEC 60870-5-103 (master) 76:

<50>

Earth leakage L3

Interoperability list according to IEC 60870-5-103 (master) 77:

<51>

Earth leakage forwards, i.e. line

Interoperability list according to IEC 60870-5-103 (master) 78:

<52>

Earth leakage backwards, i.e. bus bar

Störfall messages in monitoring direction

 

INF

Description

Interoperability list according to IEC 60870-5-103 (master) 79:

<64>

Trigger L1

Interoperability list according to IEC 60870-5-103 (master) 80:

<65>

Trigger L2

Interoperability list according to IEC 60870-5-103 (master) 81:

<66>

Trigger L3

Interoperability list according to IEC 60870-5-103 (master) 82:

<67>

Trigger N

Interoperability list according to IEC 60870-5-103 (master) 83:

<68>

General Trigger

Interoperability list according to IEC 60870-5-103 (master) 84:

<69>

Trigger L1

Interoperability list according to IEC 60870-5-103 (master) 85:

<70>

Trigger L2

Interoperability list according to IEC 60870-5-103 (master) 86:

<71>

Trigger L3

Interoperability list according to IEC 60870-5-103 (master) 87:

<72>

Auslösung UMZ- emergency operation

Interoperability list according to IEC 60870-5-103 (master) 88:

<73>

Error place X in Ohm

Interoperability list according to IEC 60870-5-103 (master) 89:

<74>

Error forwards / Line

Interoperability list according to IEC 60870-5-103 (master) 90:

<75>

Error backwards / bus bar

Interoperability list according to IEC 60870-5-103 (master) 91:

<76>

Protection signal transfer signal sent

Interoperability list according to IEC 60870-5-103 (master) 92:

<77>

Protection signal transfer signal received

Interoperability list according to IEC 60870-5-103 (master) 93:

<78>

Step 1

Interoperability list according to IEC 60870-5-103 (master) 94:

<79>

Step 2

Interoperability list according to IEC 60870-5-103 (master) 95:

<80>

Step 3

Interoperability list according to IEC 60870-5-103 (master) 96:

<81>

Step 4

Interoperability list according to IEC 60870-5-103 (master) 97:

<82>

Step 5

Interoperability list according to IEC 60870-5-103 (master) 98:

<83>

Step 6

Interoperability list according to IEC 60870-5-103 (master) 99:

<84>

General excitation

Interoperability list according to IEC 60870-5-103 (master) 100:

<85>

Switch failure

Interoperability list according to IEC 60870-5-103 (master) 101:

<86>

Trigger measurement system L1

Interoperability list according to IEC 60870-5-103 (master) 102:

<87>

Trigger measurement system L2

Interoperability list according to IEC 60870-5-103 (master) 103:

<88>

Trigger measurement system L3

Interoperability list according to IEC 60870-5-103 (master) 104:

<89>

Trigger measurement system E

Interoperability list according to IEC 60870-5-103 (master) 105:

<90>

Trigger I>

Interoperability list according to IEC 60870-5-103 (master) 106:

<91>

Trigger I>>

Interoperability list according to IEC 60870-5-103 (master) 107:

<92>

Trigger IN>

Interoperability list according to IEC 60870-5-103 (master) 108:

<93>

Trigger IN>>

AWE messages in monitoring direction

 

INF

Description

Interoperability list according to IEC 60870-5-103 (master) 109:

<128>

LS EIN via AWE

Interoperability list according to IEC 60870-5-103 (master) 110:

<129>

LS EIN via long term AWE

Interoperability list according to IEC 60870-5-103 (master) 111:

<130>

AWE blocked

Operating measurement in monitoring direction

 

INF

Description

Interoperability list according to IEC 60870-5-103 (master) 112:

<144>

Operating measurement I

Interoperability list according to IEC 60870-5-103 (master) 113:

<145>

Operating measurements I, U

Interoperability list according to IEC 60870-5-103 (master) 114:

<146>

Operating measurements I, U, P, Q

Interoperability list according to IEC 60870-5-103 (master) 115:

<147>

Operating measurements IN, UEN

Interoperability list according to IEC 60870-5-103 (master) 116:

<148>

Operating measurements IL1,2,3, UL1,2,3, P, Q, f

Generic function in monitoring direction

 

INF

Description

Interoperability list according to IEC 60870-5-103 (master) 117:

<240>

Read description of all defined groups

Interoperability list according to IEC 60870-5-103 (master) 118:

<241>

Read values or attributes of all entries of a group

Interoperability list according to IEC 60870-5-103 (master) 119:

<242>

Read directory of a single entry

Interoperability list according to IEC 60870-5-103 (master) 120:

<243>

Read value or attribute of a single entry

Interoperability list according to IEC 60870-5-103 (master) 121:

<244>

End of general interrogation generic data

Interoperability list according to IEC 60870-5-103 (master) 122:

<249>

Write entry ( with acknowledge)

Interoperability list according to IEC 60870-5-103 (master) 123:

<250>

Write entry ( with execution)

Interoperability list according to IEC 60870-5-103 (master) 124:

<251>

Write entry ( with cancel)

Selection of standardised information numbers in control direction

System functions in control direction

 

INF

Description

Interoperability list according to IEC 60870-5-103 (master) 125:

<0>

General interrogation disgust

Interoperability list according to IEC 60870-5-103 (master) 126:

<1>

Time synchronisation

General commands in control direction

 

INF

Description

Interoperability list according to IEC 60870-5-103 (master) 127:

<16>

Restart ON/OFF

Interoperability list according to IEC 60870-5-103 (master) 128:

<17>

Protection signal tansfer ON/OFF

Interoperability list according to IEC 60870-5-103 (master) 129:

<18>

Protection ON/OFF

Interoperability list according to IEC 60870-5-103 (master) 130:

<19>

Reset displays

Interoperability list according to IEC 60870-5-103 (master) 131:

<23>

Activate characteristic curve 1

Interoperability list according to IEC 60870-5-103 (master) 132:

<24>

Activate characteristic curve 2

Interoperability list according to IEC 60870-5-103 (master) 133:

<25>

Activate characteristic curve 3

Interoperability list according to IEC 60870-5-103 (master) 134:

<26>

Activate characteristic curve 4

Generic functions in control direction

 

INF

Description

Interoperability list according to IEC 60870-5-103 (master) 135:

<240>

Read description of all defined groups

Interoperability list according to IEC 60870-5-103 (master) 136:

<241>

Read value or attribute of all entries of one group

Interoperability list according to IEC 60870-5-103 (master) 137:

<243>

Read directory of single entry

Interoperability list according to IEC 60870-5-103 (master) 138:

<244>

Read value or attribute of a single entry

Interoperability list according to IEC 60870-5-103 (master) 139:

<245>

End od general interrogation generic data

Interoperability list according to IEC 60870-5-103 (master) 140:

<248>

Write entry

Interoperability list according to IEC 60870-5-103 (master) 141:

<249>

Write entry ( with acknowledge)

Interoperability list according to IEC 60870-5-103 (master) 142:

<250>

Write entry ( with execution)

Interoperability list according to IEC 60870-5-103 (master) 143:

<251>

Write entry ( with cancel)

Basic application functons

Interoperability list according to IEC 60870-5-103 (master) 144:

Test run

Interoperability list according to IEC 60870-5-103 (master) 145:

Latch of monitoring direction

Interoperability list according to IEC 60870-5-103 (master) 146:

Disturbance data

Interoperability list according to IEC 60870-5-103 (master) 147:

Generic services

Interoperability list according to IEC 60870-5-103 (master) 148:

Private data

Miscellaneous

Measured values are transferred with ASDU <3> and ASDU <9>. According to 7.2.6.8 the maximum of MVAL can be the nominal value multiplied by 1,2 or 2,4 .

In ASDU <3> and ASDU <9> no different (referring) factors can be used, i.e. for each measurement value is one selection allowed.

Measurement reading

Max. MVAL

 

rated value x ( 1 or 2 )

rated value x ( 2 or 4 )

Current L1

Interoperability list according to IEC 60870-5-103 (master) 149:

Interoperability list according to IEC 60870-5-103 (master) 150:

Current L2

Interoperability list according to IEC 60870-5-103 (master) 151:

Interoperability list according to IEC 60870-5-103 (master) 152:

Current L3

Interoperability list according to IEC 60870-5-103 (master) 153:

Interoperability list according to IEC 60870-5-103 (master) 154:

Voltage L1-E

Interoperability list according to IEC 60870-5-103 (master) 155:

Interoperability list according to IEC 60870-5-103 (master) 156:

Voltage L2-E

Interoperability list according to IEC 60870-5-103 (master) 157:

Interoperability list according to IEC 60870-5-103 (master) 158:

Voltage L3-E

Interoperability list according to IEC 60870-5-103 (master) 159:

Interoperability list according to IEC 60870-5-103 (master) 160:

Real power Q

Interoperability list according to IEC 60870-5-103 (master) 161:

Interoperability list according to IEC 60870-5-103 (master) 162:

Frequence f

Interoperability list according to IEC 60870-5-103 (master) 163:

Interoperability list according to IEC 60870-5-103 (master) 164:

Voltage between L1 and L2

Interoperability list according to IEC 60870-5-103 (master) 165:

Interoperability list according to IEC 60870-5-103 (master) 166:

Appendix