Point strategy for path erosion

Available as of V3.1.3143.0

Notice

The point strategy can only be used with path erosion.

If the orbit channel is active, error ID 51138 is output.

When point strategy is selected, the down channel is first verified to see whether the geometry consists exclusively of path erosion.

Like the Fixed vector strategy this strategy consists of a backward movement along the main axes X, Y and Z as well as along a maximum of 3 tracking axes. In practice, there is usually only one rotary tracking axis.

The strategy and the coordinates of the escape point must be defined in the NC program of the escape channel. The coordinates must be specified in the selected coordinate system for path erosion. The strategy must also be programmed in the down channel. However, this data is used only to perform a plausibility check of the selected strategy in both the down and escape channels. If the strategies are not identical, the CNC goes to error state and error ID 51137 is output.

The backward movement always consists of 2 linear movements:

During the escape movement along the first linear block, the position of the tracking axes is kept constant relative to the escape point. During the movement on the second linear block, the tracking axes are also moved to their initial position at the starting point of the path erosion geometry. With rotary axes, multiple revolutions are considered.

The figure below shows an example of the point strategy:

Point strategy for path erosion 1:
Escape movement point strategy