Fixed vector strategy for path erosion
Available as of V3.1.3138.0
![]() | The fixed vector strategy can only be used with path erosion. If the orbit channel is activated, error ID 51138 is output. |
When this strategy is selected, the down channel is first verified to see whether the geometry consists exclusively of path erosion.
The strategy consists of a backward motion along the main axes X, Y and Z as well as along a maximum of 3 tracking axes. In practice, there is usually only one rotary tracking axis. The backward motion takes place on the shifted path geometry. The shift is defined by a vector (fixed vector). Tool radius compensation can also be active.
The vector strategy and its components must be defined in the NC program of the escape channel. The strategy must also be programmed in the down channel. However, this data is used only to perform a plausibility check of the selected strategy in both the down and escape channels. If the strategies are not identical, the CNC goes to error state and error message ID 51137 is output.
Escape starts from the breakpoint, first along the vector up to its end point and then from the corresponding geometric element that was cut out on the shifted path geometry. The position of the tracking axes is kept constant during motion along the vector. Maximum escape is possible up to the starting point of the path geometry.
The starting point of the path geometry is not shifted by the vector. The final motion in the backward direction during flushing or escape is a linear motion back to the starting point.
After the approach motion (from the starting point to the first target point), the escape and path geometry are shifted only by the fixed vector. Since the starting point is not shifted, the approach motion is different in the escape and down channels sue to the path length.
This is why a different escape strategy is required for the approach motion than for the subsequent motions. This results in the two following strategies:
1. Approach motion: If there is a break during the approach motion, the position of the breakpoint, expressed as a percentage, is calculated relative to the approach motion of the escape geometry. A linear motion to this position is first generated from the breakpoint. This is followed by a linear motion back to the starting point.
2. All additional geometry elements of path erosion: Starting from the breakpoint, a linear motion is first generated along the shift vector up to its end point. The geometry is then moved back along the shifted path to the starting point.
