Before commissioning

Pay attention to the following points before commissioning:

►Make sure that an emergency stop switch complying with the valid regulations is fitted to the control station
►Check components for damage
►Check correct seating of the modules in the control cabinet and on the machine
►Tighten screw connections correctly
►Mount mechanical and electrical protective devices
►Check the wiring, connection and proper grounding