System test
Before installing the guide rails, check that the motor modules are functioning properly. You can determine whether you have assembled the motor modules properly and completely and identify defects.
Power grid
The entire system [1] must be connected to the power grid without the guide rails. The following sequence must be observed when switching on:
- ►Switch on the 24 V DC control voltage
- ►Switch on the 48 V DC power voltage
The following LEDs [1] must light up:
- Link/Act
- 48 V/16 A
- 24 V/4 A
If the LEDs do not light up
- ►Check the power supplies and fuses for voltage
- ►Check that all covers have been installed correctly
If the LEDs still do not light up after the check, contact Beckhoff Support:
support@beckhoff.com |
TwinCAT
Beckhoff also recommends checking the motor modules using TwinCAT software.
- ►Connect the EtherCAT connector to the industrial PC
- ►Start the TwinCAT project
- ►Scan the motor modules
- ►Check the motor modules for proper operation
Further information can be found in the manual TF5850 | TwinCAT 3 XTS: