Completion of the mounting

Completion of the mounting 1:
Tighten the screws [1] in the curved segments
Tighten the screws [2] in the curved segments
Observe tightening torques:

Components

Tightening torque [Nm]

Screws, M4 x 40

4

Completion of the mounting 2:
Tighten the screws [1] in the module [2]
Observe tightening torques:

Components

Tightening torque [Nm]

Screws, M5 x 20

6

Completion of the mounting 3:
Apply liquid threadlocker [2] to the screws [1], insert them into the straight guide rails [3] and tighten them
Observe tightening torques:

Components

Tightening torque [Nm]

Screws, M4 x 40

4

Completion of the mounting 4:

Smaller washer for modules with connection cables

Beckhoff recommends using a washer with a smaller diameter at the recesses for the connection cables in the machine bed to prevent damage to the connection cables.

Completion of the mounting 5:
Insert screw [1] with washer [2] into the module with connection cables [3] and tighten
Insert screw [1] with small washer [4] into the module with connection cables [3] and tighten
Tighten screw [5]
Observe tightening torques:

Components

Tightening torque [Nm]

Screws, M5 x 20

6

Completion of the mounting 6:
Insert screws [1] with washers [2] into all straight modules [3] and tighten them
Tighten screw [4]
Observe tightening torques:

Components

Tightening torque [Nm]

Screws, M5 x 20

6

Completion of the mounting 7:

The guide rails must be connected to each other at the connectors:

Insert screw [1] with washers [2] and nut [3] through the recesses on the guide rails and tighten them
Observe tightening torques:

Components

Tightening torque [Nm]

Screws, M3 x 30

Nuts, M3

2

Connect all other connectors of the guide rails in the same way