Functional earth
![]() | Installation with protective conductor connection When installing electrical systems and components, the protective conductors must be connected first. They must be disconnected last when uninstalling. Depending on the magnitude of the leakage currents, observe the following regulations for the implementation of the protective conductor connection:
|
Value | Explanation |
---|---|
KU | Variable for the classification of safety-related types of failure for protection against dangerous shock current and excessive heating |
KU = 4.5 | Achieved in relation to interruption: |
KU = 6 | Achieved in relation to interruption: |
- ►Screw the cable lug of the ground strap [1] to the functional earth connection [4] of the tile using a screw [2] and washers [3]
- ►Screw the cable lug of the ground strap [1] to the machine bed [4] using a screw [2] and washers [3]
There are two options for the functional earthing of your system:
- Connection to a grounding bar
- Connection of several machine beds