Requirements
- Components show no signs of damage
- The undersides of the movers are free from dirt and foreign objects
- Ferromagnetic objects in the vicinity of the movers are removed
- The surface of the tiles is free of dirt and foreign objects
- The surface of the tiles is correctly and evenly aligned
- The surface of the tiles is even
- Screw connections of the components are correctly tightened
- Mechanical protective equipment is correctly installed
- Electrical protective equipment is correctly installed
- Wiring and cables are installed correctly
- Machine bed is correctly grounded
- Tools and attachments are functional
- Protection against moving and live parts is correctly installed
- Current version of TwinCAT XAE, TF5890 and TF5400 software is installed on an IPC
- Control voltage is switched on
- Supply voltage is switched on
Further information on the requirements can be found in chapters Mechanical Installation – Part 1: Tiles, Mechanical Installation – Part 2: Mover and Electrical installation.