Certification

The certification of TwinCAT Power Plant Control as a PGP controller confirms conformity with the following standards (see References):

Standard

Description

Certification

VDE AR-N 4110:2023

Technical requirements for the connection of customer installations to the medium voltage network (TAR medium voltage).

Pending
Expected Q3/2025

VDE AR-N 4120:2018

Technical requirements for the connection and operation of customer installations to the high voltage network (TAR high voltage).

Pending
Expected Q3/2025

VDE AR-N 4130:2018

Technical requirements for the connection and operation of customer installations to the extra high voltage network (TAR extra high voltage)

Pending
Expected Q3/2025

EN 50549-2:2019

Connection to a MV distribution network - Generating plants

Pending
Expected Q4/2025

PPPiREE, V1.3: 2024

Technical implementation of (EU) 2016-631 for Poland.

Pending
Expected Q4/2025

Regulatory principles

The EU Regulation (EU) 2016/631 is also known as the Network Code Requirements for Generators (NC RfG) and forms the legal framework for the grid connection conditions for power generating plants in Europe. The EN 50549-2 standard specifies these requirements by describing detailed technical requirements for the connection.

In addition, national regulations, such as VDE-AR-N 4110, 4120 and 4130 in Germany, close the gap between the Europe-wide specifications of the NC RfG and the technical specifications of the EN standards. They thus create binding rules for grid integration at national level.

The FGW TR3 (Technical Guideline 3 of the Fördergesellschaft Windenergie und andere Dezentrale Energien e.V.) describes the determination of electrical properties of power generating units and plants within the scope of type and component certifications. It specifies the methods and test procedures used to verify electrical behavior in relation to the grid.

PPPiREE (Polskie Porozumienie Producentów i Rozdzielców Energii Elektrycznej) is the Polish industry organization for electricity producers and distributors that, among other things, coordinates the technical implementation of EU Regulation (EU) 2016/631 (NC I RfG) in Poland. It establishes guidelines and technical specifications that convert European grid connection requirements into national regulations.

These documents are closely linked: