PLC

Loading program code, logging in and starting the PLC

A stand-alone PLC project is integrated into a TwinCAT project.
1.
Activate the TwinCAT project configuration. To do this, select the command Activate Configuration from the toolbar.
2.
Log into the PLC in the stand-alone PLC project and start the PLC.
 
 separatetc3project_start_en-us