ITcPlcTaskReference
The ITcPlcTaskReference interface enables programmers to get or set the currently linked task of a PLC project. This matches the following TwinCAT XAE entry:
Properties (in VTable Order)
Requirements
ITcPlcTaskReference properties |
Get / Set |
Description |
Available since |
---|---|---|---|
LinkedTask |
Yes / Yes |
Gets or sets the linked task of a PLC project. When setting a new linked task, the task will be specified as a string which represents the path to the task in the TwinCAT XAE tree. |
TwinCAT 3.1 |