Test run with TwinCAT NC

Test run with TwinCAT NC 1:
  • Requirement: The I/O module of EP7047-1032 is linked to an NC axis.
1. Activate the TwinCAT configuration.
2. Double-click the NC axis.
3. Click the "Online" tab.
4. Click the "Set" button in the "Enabling" field.
5. Click the "All" button in the window that appears.
  • The output stage is enabled.
  • You can use the colored buttons to move the axis for testing purposes.