Before commissioning

Pay attention to the following points before commissioning:

Make sure that an emergency stop switch complying with the valid regulations is fitted to the control station
Check components for damage
Check mounting and alignment
Check correct seating of the modules in the control cabinet and on the machine
Tighten screw connections correctly
Mount mechanical and electrical protective devices
Check the wiring, connection and proper grounding