Before commissioning
Pay attention to the following points before commissioning:
- ►Make sure that an emergency stop switch complying with the valid regulations is fitted to the control station
- ►Check components for damage
- ►Check mounting and alignment
- ►Check correct seating of the modules in the control cabinet and on the machine
- ►Tighten screw connections correctly
- ►Mount mechanical and electrical protective devices
- ►Check the wiring, connection and proper grounding