Guidelines
2014/35/EU
Low Voltage Directive
2011/65/EU
RoHS Directive
2014/30/EU
EMC Directive
Installation with protective conductor connection When installing electrical systems and components, the protective conductors must be connected first. They must be disconnected last when uninstalling. Depending on the magnitude of the leakage currents, observe the following regulations for the implementation of the protective conductor connection:
|
Value | Explanation |
---|---|
KU | Variable for the classification of safety-related types of failure for protection against dangerous shock current and excessive heating |
KU = 4.5 | Achieved in relation to interruption: |
KU = 6 | Achieved in relation to interruption: |