Transitions

During startup the EtherCAT system passes through the following states: Init, Pre-Operational, Safe-Operational, and Operational (see chapter EtherCAT State Machine). @@@macht wenig Sinn das zu übersetzen.

Transitions 1:

The diagram shows the following transitions:

IP: Transition from Init to Pre-Operational

PS: Transition from Pre-Operational to Safe-Operational

SO: Transition from Safe-Operational to Operational

OS: Transition from Operational to Safe-Operational

SP: Transition from Safe-Operational to Pre-Operational

PI: Transition from Pre-Operational to Init

 

In practice the parameters (IDNs) are transferred from the higher-level control system to the AX5000 during transitions IP, PS and SO.

The TwinCAT System Manager indicates at which transition the individual AX5000 parameters can be transferred.

Transitions 2: