Duty cycle

Duty cycle 1:

Position

Explanation

1

Switch-on time ton

2

Cycle time

The duty cycle indicates the proportion of the cycle time during which a device is turned on and under load. It is expressed as a percentage of the total cycle time.

The duty cycle is a relative value that depends on the switch-on time ton and the cycle time.

A cycle time of up to 120 seconds is incorporated directly into the calculation. If the cycle time exceeds 120 seconds, you must use the maximum relevant cycle time of 120 seconds.

Calculation equation

Duty cycle 2:

Sample calculations

ton = 60 s

Cycle time = 120 s

 

60 s / 120 s x 100% = 50% duty cycle

ton = 40 s

Cycle time = 100 s

 

40 s / 100 s x 100% = 40% duty cycle