Disassembly
| |
Avoid contact with DC link DC+ and DC- Measure the voltage on the DC link test contacts DC+ and DC-. Observe the waiting times after disconnection from the supply network:
|
![]() | Do not remove components from the products Only Contact Beckhoff Service for further information. |
Removing the mains choke from the machine
- ►Remove cables and electrical connections
- ►Loosen and remove the mains choke fixing screws
- ►Transport the mains choke to the workplace or put it into storage

