Electrical installation
| |
Avoid contact with DC link DC+ and DC- Measure the voltage on the DC link test contacts DC+ und DC-. Keep to the waiting times after disconnection from the supply network:
|
Note | |
Electromagnetic compatibility Connect all components and use only shielded cables. Ground the shields of the assembled cables via the mounting plate and place the star point centrally on the unpainted mounting plate. In the case of larger applications, implement the potential equalization via PE rails. Improper grounding or faulty contacting can lead to damage to the multi-axis servo system or to EMC interference emissions. The minimum cross-sections of separate protective conductors can be found in EN 61439-1. |
- 1. Make the ground (PE) connection [1]
- 2. Make the following connections [2]:
- L1/L1´
- L2/L2´
- L3/L3´
Further Information