Electrical installation

WARNING

Avoid contact with DC link DC+ and DC-

Measure the voltage on the DC link test contacts DC+ und DC-. Keep to the waiting times after disconnection from the supply network:

    • 30 minutes for AX8620 and AX8640
    • 30 minutes for AX8108, AX8118 and AX8206
    • There is still a life-threatening voltage of > 875 VDC on the capacitors after disconnection from the supply network. Serious or even fatal injuries may result if this is ignored.

    Note

    Electromagnetic compatibility

    Connect all components and use only shielded cables. Ground the shields of the assembled cables via the mounting plate and place the star point centrally on the unpainted mounting plate.

    In the case of larger applications, implement the potential equalization via PE rails.

    Improper grounding or faulty contacting can lead to damage to the multi-axis servo system or to EMC interference emissions. The minimum cross-sections of separate protective conductors can be found in EN 61439-1.

    Electrical installation 1:
    1. Make the ground (PE) connection [1]
    Electrical installation 2:
    2. Make the following connections [2]: