Before commissioning
Pay attention to the following points before commissioning:
- Make sure that an emergency stop switch complying with the valid regulations is fitted to the control station
- Check components for damage
- Check mounting and alignment
- Check correct seating of the modules in the control cabinet and on the machine
- Tighten screw connections correctly
- Mount mechanical and electrical protective devices
- Check the wiring, connection and proper grounding