Before commissioning
Notice | |
Limited functionality due to unformed capacitors The dielectric in the DC link capacitors decreases over a very long storage period and the capacitors lose their forming. This can lead to considerable functional restrictions and even a shortened service life of the device.
|
Pay attention to the following points before commissioning:
- Make sure that an emergency stop switch complying with the valid regulations is fitted to the control station
- Check components for damage
- Check mounting and alignment
- Check correct seating of the modules in the control cabinet and on the machine
- Tighten screw connections correctly
- Mount mechanical and electrical protective devices
- Check the wiring, connection and proper grounding
Installing the M8 jumper plug on the AMP8xxx-xxx2
Before commissioning, the supplied M8 jumper plug [3] must be installed on the M8 connection [1] with 0.4 Nm to establish the electrical connection between the motor electronics and the holding brake.
Also make sure to use the tamper protection [2] according to the chapter Activation of the holding brake for service purposes.