Before commissioning

Pay attention to the following points before commissioning:

In the case of multi-axis systems, commission each drive unit separately
Read the operating instructions for the servo drive
Check drive for damage
Check mounting and alignment
Tighten screw connections correctly
Installing mechanical, thermal and electrical protective devices
Check the wiring, connection and proper grounding of the motor and servo drive