Commissioning and configuration
EPP1321-0060 is ready for operation if all required cables are connected. You do not need to make any settings to the device.
Use the status LEDs to check that all cables are connected correctly.
Further Information
EPP1321-0060 is ready for operation if all required cables are connected. You do not need to make any settings to the device.
Use the status LEDs to check that all cables are connected correctly.